Cooling Tower Condenser Online Ball Cleaning System

Product Details
Customization: Available
Type: Condenser Cleaning Device
Usage: Environmental Protection
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
QA/QC Inspectors
The supplier has 1 QA and QC inspection staff
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (24)
  • Cooling Tower Condenser Online Ball Cleaning System
Find Similar Products

Basic Info.

Model NO.
YL-JC-900
Motive Force
Electric power
Style
Vertical
Performance
Tube Cleaning Device
Certification
CE, GS
Ball Pitcher
Carbon Steel,Ss
Ball Collector
Carbon Steel Shell,Ss Filter Screen
Mesh Screen of Ball Collector
1000 Micron-5000 Micron
Cleaning Type
Rubber Ball Automatic Cleaning
Power Supply
200--1000W
Working Pressure
0.2-1.6MPa
Cleaning Ball
Rubber,Ss
Control
Automatic Cleaning,Manual Timely
Transport Package
Plywood Case Packaged Into Container
Specification
to be practical
Trademark
YLD
Origin
Jiangyin, China
HS Code
842121999
Production Capacity
30 Sets/Month

Product Description



Condenser rubber ball cleaning device
 
For central air conditioning condenser and evaporator pipe, it is easy to be scaling. The normal daily water treatment should be processed during the summer time cooling water supply period,otherwise, the condenser will run in the high degree hardness water system,inorganic salts dissolved  in circulating cooling water system will be crystallized and precipitated out ,scales will be formed on the tubes of condenserand it will reduce heat exchange efficiency. as hard scale increased, energy-consumption will be increased, when the knot hard mass scale is 1mm in thickness,the energy cost will be increased by 6%~10%; as water form scales with dirt, sediment, and rot colonization dirt, also the bacteria, and algae, microbial and its secretion form bio stick mud, it will attach in the pipes of condensation device, seriously it will caused pipeline block.Dirt and mud will effect hot exchange efficiency, higher energy cost will lead to high power voltage, seriously it cause super pressure voltage tilldowntime. Allthese factors affect the normal operation of the heat exchanger.
Cooling Tower Condenser Online Ball Cleaning System

Condenser Tube Cleaning Device
Condenser and Concrete tube scaling is one of the most underestimated problems in the industry. It results in decrease of productivity and efficiency of the plant. We handle the two major methods used to fight the scaling. We provide online Condenser Tube Cleaning Systems (CTCS) along with Condenser Cleaning Sponge Balls made from Food Grade-A natural rubber to clean out the scaling. Furthermore, we also provide Offline Bullet Cleaning with our own skilled labor, machines and bronze bullets which can be performed during overhaul and shutdown. For the purpose of tackling similar problems with the Concrete Industry we have our Vulcan Clean-out Balls also made from Food Grade-A natural rubber.
 
Working Procedures
 
 
The cleaning balls are introduced and removed from the system through the ball collector. The collector interior is partitioned by a screen into two areas. When the collector is in the ball collection or retention mode the screen separates the collector inlet and outlet. When the screen is positioned such that the inlet and outlet are no longer separated, the balls are conveyed by the flow to the injection site(s). The balls are injected into the cold leg of the circulating cooling water system serving the condenser or heat exchanger so as to achieve a random distribution within the stream. Because the balls (when deaerated) have nearly the same specific gravity as the cooling water, they follow the same path as the water within which they are suspended.
 
Ball Collector in the open (recirculation) mode. Both the inlet and outlet of the collector are on the same side of the collector screen.
Ball Collector in the collection (ball capture) mode. The screen has been rotated so as to separate the inlet and outlet of the collector.
 
When the ball charge is correctly sized, each tube is treated by a ball approximately once every five minutes. When the balls have passed through the tubes and enter the cooling water discharge line they are intercepted by the ball strainer(s). When the balls meet the strainer screen they are driven along the screen surface to the ball extraction port located at the point where the down stream extremity of the screen meets the spool body. The balls are then conveyed by a special pump through the ball collector and once again to the injection site.
Cooling Tower Condenser Online Ball Cleaning System

 
Characteristics of condenser online cleaning device
 
1.energy saving,Min 10% and Max 40% ,99%rubber ball could be collected.
2, one-time investment cost could be recovered within one year.
3, automatic on-line cleaning to ensure without fouling, corrosion on the condenser.
4, avoid and eliminate air conditioner engine from abnormal pressure during operation.
5, prolong the service lifespan of compressor and the pipeline.
6, ensure the condenser to be in high heat transfer efficiency.
7,complete physical processing, cost- saving in chemical treatment, environmental protection.
 
8, full PLC computer programming control, no technicians maintainenance and regulates the frequency of automatic cleaning condenser every day.




Technical parameters
 
1. Performance: ball collecting rate ≤95%
2. Input voltage: 380V / 50HZ
3. Power: ≤5KW
4. Work environment requirements: Temperature ≤55 ºC, humidity ≤95 ºCRelative
5. Pressure loss: 0.003MPa-0.05MPa
6. Water temperature: ≤50 ºC
7. Working Pressure: ≤1.6MPa.
Cooling Tower Condenser Online Ball Cleaning System
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier