Product Description
Condenser rubber ball cleaning device
For central air conditioning condenser and evaporator pipe, it is easy to be scaling. The normal daily water treatment should be processed during the summer time cooling water supply period,otherwise, the condenser will run in the high degree hardness water system,inorganic salts dissolved in circulating cooling water system will be crystallized and precipitated out ,scales will be formed on the tubes of condenserand it will reduce heat exchange efficiency. as hard scale increased, energy-consumption will be increased, when the knot hard mass scale is 1mm in thickness,the energy cost will be increased by 6%~10%; as water form scales with dirt, sediment, and rot colonization dirt, also the bacteria, and algae, microbial and its secretion form bio stick mud, it will attach in the pipes of condensation device, seriously it will caused pipeline block.Dirt and mud will effect hot exchange efficiency, higher energy cost will lead to high power voltage, seriously it cause super pressure voltage tilldowntime. Allthese factors affect the normal operation of the heat exchanger.
Condenser Tube Cleaning Device
Condenser and Concrete tube scaling is one of the most underestimated problems in the industry. It results in decrease of productivity and efficiency of the plant. We handle the two major methods used to fight the scaling. We provide online Condenser Tube Cleaning Systems (CTCS) along with Condenser Cleaning Sponge Balls made from Food Grade-A natural rubber to clean out the scaling. Furthermore, we also provide Offline Bullet Cleaning with our own skilled labor, machines and bronze bullets which can be performed during overhaul and shutdown. For the purpose of tackling similar problems with the Concrete Industry we have our Vulcan Clean-out Balls also made from Food Grade-A natural rubber.
Working Procedures
The cleaning balls are introduced and removed from the system through the ball collector. The collector interior is partitioned by a screen into two areas. When the collector is in the ball collection or retention mode the screen separates the collector inlet and outlet. When the screen is positioned such that the inlet and outlet are no longer separated, the balls are conveyed by the flow to the injection site(s). The balls are injected into the cold leg of the circulating cooling water system serving the condenser or heat exchanger so as to achieve a random distribution within the stream. Because the balls (when deaerated) have nearly the same specific gravity as the cooling water, they follow the same path as the water within which they are suspended.
Ball Collector in the open (recirculation) mode. Both the inlet and outlet of the collector are on the same side of the collector screen.
Ball Collector in the collection (ball capture) mode. The screen has been rotated so as to separate the inlet and outlet of the collector.
When the ball charge is correctly sized, each tube is treated by a ball approximately once every five minutes. When the balls have passed through the tubes and enter the cooling water discharge line they are intercepted by the ball strainer(s). When the balls meet the strainer screen they are driven along the screen surface to the ball extraction port located at the point where the down stream extremity of the screen meets the spool body. The balls are then conveyed by a special pump through the ball collector and once again to the injection site.
Automatic Tube-cleaning of cooling tower condenser
In a water-cooled air conditioning system, heat is rejected from the refrigerant to the cooling water in the condenser. The impurities in the cooling water circuit are accumulated, and thus the scales and deposits are built up in the condenser tubes, creating fouling problems on the condenser heat transfer surfaces. When fouling and scaling in the condenser increase, the efficiency of the condenser will deteriorate and thus increase chiller energy consumption.
The automatic tube cleaning system is usually installed as an integral part of the condenser. The system cleans the condenser tubes by circulating a number of soft sponge balls through the tubes at pre-set time interval. Since the balls are soft and light in nature, they will not cause any damage to the condenser tube surface and can be carried easily through the tubes by the flowing of water.
Characteristics of condenser online cleaning device
1.energy saving,Min 10% and Max 40% ,99%rubber ball could be collected.
2, one-time investment cost could be recovered within one year.
3, automatic on-line cleaning to ensure without fouling, corrosion on the condenser.
4, avoid and eliminate air conditioner engine from abnormal pressure during operation.
5, prolong the service lifespan of compressor and the pipeline.
6, ensure the condenser to be in high heat transfer efficiency.
7,complete physical processing, cost- saving in chemical treatment, environmental protection.
8, full PLC computer programming control, no technicians maintainenance and regulates the frequency of automatic cleaning condenser every day.
Technical parameters
1. Performance: ball collecting rate ≤95%
2. Input voltage: 380V / 50HZ
3. Power: ≤5KW
4. Work environment requirements: Temperature ≤55 ºC, humidity ≤95 ºCRelative
5. Pressure loss: 0.003MPa-0.05MPa
6. Water temperature: ≤50 ºC
7. Working Pressure: ≤1.6MPa.